Turbine Manufacturing
İğrek Makina focused on developing and producing Machine Tools and Wind Energy Turbines
İğrek Makina, well known manufacturer of automotive stamping dies, machine-tool parts, wind energy equipment parts, castings for aerospace industry whom exported 30% of its total production last year keeps on strengthening its R&D Centre and making new products. Company also aims to establish a warehouse with a liaison and sales office in Germany to increase direct export and introduce the new series of machine tools to European market.
Fatih İğrek, the Production and Planning Manager of İğrek Makina, which was founded by Osman İğrek in 1946 and having a casting capacity of up to 70 tons/piece today, said that the years 2017 and 2018 have been good for the automotive sector in Turkey and that their company continues to work with the manufacturers of important wind turbine producers, automotive brands and their tool & die suppliers. İğrek, stating that they finished the year of 2017 with a growth rate of 5%, said: “We produce and do machining for various castings for the leading European manufacturers of wind turbines and we also make stamping die castings for automobile manufacturers. Our casting production continues for Ferrari, Renault, Daimler, Volkswagen and many other companies. We came to be known as a leading brand in our field in Europe. In 2017, we exported 30 percent of our total production. Germany and Italy have been our main focus countries in exports. Our current goal is to increase our export volume and we have been preparing our projections in this direction. We want to increase our direct export ratio and introduce the machine tools we produce to Europe by establishing a warehouse with liaison and sales office in Europe.”
Production area enlarged to 50.000 m2 by recent investments and the experience in producing for wind turbines advances
İğrek, who said that they have increased their production are up to 50.000 m2 by investing in additional facilities and renovation in the direction of production of casting parts and CNC machine tools for automotive, aerospace, energy and other heavy industry branches also mentioned that: “Our company is divided into four main departments: Foundry, Machining, Machine Tools Production and R&D. We have installed new equipments and systems for the purpose of improving casting surface quality and enhancing the capacity. We have a successful metallurgical laboratory team working for the best surface and structural quality. Our R&D staff works for developing large sized, high speed and precision type CNC milling machines and vertical lathes with high technology. Which up to date not locally produced in our country. We have been working on the production of simultaneous, 2-axis, electromechanical milling heads for the first time in the industry. We will introduce to our local market the advantages of being able to purchase large type CNC milling machines and vertical lathes domestically. Our prototypes will be completed this year and their introduction to market will begin. We use 3D scanning and measuring technology for reverse engineering in addition to CAD-CAM support for casting part and polystyrol pattern production and quality control.”
The company İğrek, which has one of the richest and most sophisticated processing machining equipment park in our country, has a high competence in the production and machining of casting parts for wind turbines. The company, which can do casting, milling, grinding and turning the main parts of the wind turbine, such as generator rotors and stators, gear boxes and interconnection parts, hubs, carriers, mainframes, shafts is quite ambitious to be one of the main providers of the wind turbine production industry, which is increasing day by day in Turkey. With a casting capacity up to 2000 tons per month, the company meets domestic and foreign demands with its 10-meter bridge type 5-axis CNC milling machine, 2 CNC vertical lathes with 5-meter diameter, and 12×4-meter horizontal boring mill machine with rotary table. We are also considering additional investments in the horizontal boring mill machines. These machines are capable of machining the casting parts of wind turbines in the most appropriate, productive way and with high quality. As one the suppliers of the MILRES project, which is the first locally produced wind turbine of Turkey, our company is the direction of becoming a a major solution partner for wind turbine manufacturers to be established in our country in the following years. Company is up to become a main provider in the 1 GW YEKA project, and apart from this, also comes to the forefront with the supply of parts in other wind turbine production excluding the YEKA.
About the production of 1.5 MW wind turbine and CNC machines tools at its R&D centre
İğrek stated that they had received the official R&D centre title officially from the Turkish Ministry of Industry and Technology in 2017, and said, “We created an office space of 500 m2 for the R&D centre. We perform the outcomes of studies in the R&D Department in our new production building of 5000 m2. We have also built a material research lab. We have started off with the 27-staff R&D team, but we will increase this number even further. Our R&D centre will provide service for the production of machine tools made from casting body structure for mainly automotive, energy, aerospace sectors. On the other hand, İğrek reminded that they returned to the machine manufacturing they had stopped years ago by manufacturing the largest ever locally produced bridge type 5-axis CNC milling machine in 2016, and indicated these:
“Our goal is to produce CNC vertical lathes, milling machines and machining centres. We have been supplying many parts for machine tool manufacturers for many years up to now. We have noticed the lack of domestic production in the machine tools which are present in every company, needed in the automobile tool and die sector and can work in the aerospace industries, which are the high valued targets of our country and the World. For this reason, we have concentrated on milling and turning machines. Our aim is to produce very high-tech machines at European quality but at affordable prices.
Our R&D activities have been continuing rapidly in the production of Wind Energy Turbine, and in this regard, we are about to complete the production of the first 1.5 MW direct-drive wind energy turbine generator as domestic production. Our challenge and major goal for this year is to complete the prototype of our wind turbine with direct-drive generator technology. As regarding machine tools, we will complete the performance tests internally and start the market introduction of the 5-axis milling machine with simultaneous processing milling head.
In 2018 and 2019, we aim to participate in all domestic and European fairs on Machine Tools, Foundry Technologies and Wind Energy to discover new technologies while introducing ourselves and be close to them. Turkey aims to close 2018 with a record of (over 170 billion dollars) export volume. We are also aiming to contribute to this goal by correcting the import-export balance in our favour. We see that this is an important task on our share on behalf of our country as our debt to ourselves as well as to our country.”
“We aim affordable prices and good quality of domestic products”
Fatih İğrek pointed out that they started off with the aim of affordable prices and good quality of domestic products in the machine tools, and made his remarks like that: “We want to produce very high-tech machines and wind turbines at European quality, but at affordable prices. At the forefront of the most important features of our machine tools and turbines is that they are adaptable to the benefits of Industry 4.0. We have set the goal to sell at least 5 milling machines for the year 2018 and 2 vertical lathes in machine tools. In wind turbine, we aim to complete the prototype this year, to carry out the tests and to start the mass production in 2019. If there is more demand, we may go for capacity increase. We also aim to export.
One of the oldest established companies in its field
Fatih İğrek, who stated that the main activity of work of İğrek Makina was established in central Bursa as a manufacturer of cast iron and bronze parts. He added that the company started to manufacture woodworking machinery in 1950’s and became one of the leading brands of Turkey in its field. Then, İğrek remarked that the company moved to its factory in Bursa Central Station. “When it came to 1970’s, the factory investment was made in Bursa Organized Industry Zone and all production was taken there. In 1980’s, the first electric induction furnace increased the casting technology and capacity. Thus, the production of the woodworking machinery came to an end. Starting to concentrate on high peak, nodular cast iron and steel castings, in 1990’s, setting up its first CNC machine tools and started machining of large parts. In 2003, putting CNC polystyrol pattern production machines into use. İğrek Makina made an impression in the market with its hi-tech pattern production shop all across Europe. Therefore, it transformed into an integrated factory which gives pattern production, casting and machining services at the same facility. İğrek Makina, which established R&D and machine design departments in 2016, has reached a casting capacity up to 70 tons/piece in the foundry”, he said.
Manufacturers of wind turbines
SoyutWind: Powering Tomorrow from Today The Wind Turbine Manufacturer of Türkiye
In the heart of Türkiye, a revolution is spinning. Since 2000, SoyutWind, born from the legacy of Çolak Holding, has harnessed the invisible and unleashed the incredible.
We’re not just building turbines; we’re engineering the future.
At our factory in Ankara-TÜRKİYE, spanning 135,000 square meters with 15,000 square meters of indoor space, we work diligently every day alongside our skilled engineers and manufacturing team, knowing that we are shaping the future.
Our mission is to make renewable energy sources more accessible and effective, guided by our commitment to sustainable total quality management.
We continuously develop and rigorously test our wind turbine technologies to meet, exceeding the highest industry standards. Our international certifications reflect our unwavering commitment to sustainability and quality.
Our products, ranging from grid-connected wind turbines to residential battery-powered wind turbines and the Soyut WindMill agricultural water pump, are all developed with an unwavering commitment to innovation.
With our 50 years of industrial heritage, 25 years of wind turbine manufacturing experience, robust financial foundation, skilled and experienced team, an extensive domestic and international service network, and exceptional production and engineering capabilities, we proudly lead the way with groundbreaking achievements.
We face the future with confidence.
• Pioneers of direct drive wind turbines up to 1 MW – a first in Türkiye and the region
• Turbine capacity reaching up to 2.5 MW
• 50 years of industrial mastery
• 25 years of relentless wind energy innovation
Our sprawling 135,000-square-meter facility isn’t just a factory. It’s where dreams take flight.
SoyutWind stands as Türkiye’s premier local wind turbine manufacturer, holding the distinction of being the country’s first and only. Our international certifications attest to our world-class standards, while our expansive network spans nations, empowering communities. Our arsenal of innovation includes:
1.Grid-connected titans of power
2.Residential turbines bringing freedom to homes
3.Soyut WindMill – revolutionizing agriculture, one pump at a time
But our true power? It’s not in our machines; it’s in our people.
A team is driven not by the wind but by passion. By vision. By the unyielding belief that we can change the world, one turbine at a time.
With every rotation, we’re not just generating electricity. We’re powering dreams. Energizing economies. Breathing life into a sustainable future.
From the hills of Anatolia to the far corners of the globe, SoyutWind isn’t just riding the winds of change; we’re creating them.
Turbine Manufacturing
Powering the Future: LEITWIND’s Customizable Wind Turbines
LEITWIND, the only Italian manufacturer of megawatt-class wind turbines (ranging from 250 kW to 3,000 kW), stands out in the market for its ability to customize products, always aiming to find the most efficient and reliable solutions for its customers. This customer-focused approach has led to the erection of over 400 wind turbines worldwide, including 10 installations in Turkey
This success is driven by continuous investments in R&D and the support of LEITWIND’s parent company, High Technology Industries (HTI) Group—a global leader in the winter sports sector with brands like LEITNER, POMA, DEMACLENKO, and PRINOTH. The Group’s high standards of quality and reliability are recognized worldwide, with a global presence that includes 21 production sites, 108 branches, and 138 sales and service centers.
There are many factors that have made LEITWIND so competitive in the Turkish market: state-of- the-art technology, the offer of a complete all-inclusive package that includes, in addition to the standard supply of wind turbines, also the support during the authorization and construction procedures and the strong local presence: in fact, after LEITNER TURKEY, which opened in May 2012 to follow the ropeway industry, the subsidiary LEITWIND TURKEY opened its doors in Bursa.
With more than 20 years of expertise in megawatt-class wind turbines, LEITWIND differentiates itself from competitors through its “medium-sized” product portfolio (250 kW-3,000 kW), offering advantages such as easier transport, installation, and long-term management. Additionally, LEITWIND turbines are designed with a modular concept, allowing for adaptation to both customer needs and specific site requirements.
LEITWIND remains committed to continuous product optimization, with the LTW90 wind turbine (500-2,000 kW) standing as a prime example and the flagship model in LEITWIND’s portfolio. Boasting a large rotor surface, the LTW90 excels in energy production, even in low-wind areas, making it an ideal choice for single-installation projects. In 2023, the first LTW90 with a capacity of 1,500 kW was successfully installed in Lüleburgaz (Kırklareli).Looking ahead, a 2,000 kW LTW90 installation is planned for 2025, underscoring the global significance and competitive edge of the LTW90 model in the
Turbine Manufacturing
Innovation and Sustainability: LEITWIND transforms the Turkish Wind Energy Market
Wind energy plays a key role in achieving our country’s renewable energy goals. LEITWIND, an Italian company specialized in the design, installation, and maintenance of megawatt-class wind turbines (ranging from 250 kW to 3,000 kW), thanks to its investments in R&D and its wide product porfolio, is able to offer the most suitable solution for every need, ensuring the highest quality and reliability.
A clear example of this commitment is the development of the configuration LTW90 with a nominal power of 1500 kW. With its large rotor diameter, this turbine ensures significant energy production even in low wind conditions, setting it apart from competitors in the same market segment.
In spring 2023, the first installation of this wind turbine in Turkey was successfully completed in the municipality of Lüleburgaz, located in the province of Kırklareli in the Marmara region. The average annual energy production of this wind turbine’ can meet the annual consumption of over 1,100 Turkish households. Furthermore, the wind turbine is equipped with D4.1 generator, the most advanced generator model, which offers significant benefits in electrical power control, efficient use of brakes , compliance with grid codes, and reduced noise emissions.
“There are several factors that have made LEITWIND so competitive in the Turkish market: cutting- edge technology, the approach to investments in line with European standards, and, last but not least, a strong local presence: in fact, after LEITNER TURKEY, inaugurated in May 2012 for the ropeway sector, LEITWIND’s Turkish subsidiary opened its doors in Bursa LEITWIND differentiates itself from its competitors in every single phase of the project , from the quickness of installation to the wide range of services offered, from the quality and reliability of the products to the quick return on investment and definitely for the know-how shared with the HTI Group, to which it belongs. This has allowed us to successfully install 10 LEITWIND wind turbines in Turkey and enables us to work with an increasing number of local investors,” stated Can Güven, Sales Manager Turkey.
-
Events6 years ago
Canada and Turkey women working in the renewable energy sector in met
-
Manufacturers of wind turbines6 years ago
GE’s Haliade-X 12 MW prototype to be installed in Rotterdam
-
Operations and Maintenance6 years ago
GENBA is on the rise; another milestone passed by in global existence
-
Genel9 years ago
EWT launches the DW61, It’s most efficient and high energy producing wind turbine
-
Genel9 years ago
Internet of things will empower the wind energy power plants
-
Energy management systems6 years ago
Demand/Supply – Renewable energy with guarantees of origin (GO)
-
Events6 years ago
Key Players from 10 Nations will Show Their Strong Positions at APWEE
-
Manufacturers of wind turbines4 years ago
ENERCON installs E-160 EP5 prototype
-
Manufacturers of wind turbines6 years ago
The Nordex Group receives first order for Delta4000 turbines from the USA
-
Genel8 years ago
Zorlu energy envisages a bold new future based on renewables
-
Manufacturers of wind turbines6 years ago
ENERCON and Lagerwey together develop two new WEC types
-
Components / supplier6 years ago
Revolution in Tensile Testing By BERDAN