Contents
Türkiye Elektrik İletim A.Ş. (TEİAŞ), Turkey’s transmission system operator, updated its remaining capacity map on 2 November for unlicensed wind (RES) and solar (GES) plants connecting at transmission voltage level. The map divides the country into 15 regions, and 11 of them show zero. Capacity is given in MWe and shown jointly for wind and solar.
The four regions with remaining capacity are:
- Region 11: 14.1 MWe
- Region 12: 13.8 MWe
- Region 8: 5.4 MWe
- Region 3: 5 MWe
Together, the four figures add up to 38.3 MWe.
September application found no capacity
TEİAŞ also released its evaluation report on September applications for connection to the transmission system, assessed under Energy Market Regulatory Board Decision No. 14353 of 26 February 2026. According to the report, only one application was filed between 1 and 30 September 2026. It came from Kayseri, in Region 9, for 0.4 MWe, and its scope was listed as Article 5 (1-ç).
The application was not allocated any capacity. The report states that the regional capacity table dated 30 September 2026 had announced no capacity for that region. Region 9 also shows zero on the 2 November map.
Distribution-level table also updated
TEİAŞ also refreshed its 2026 table of remaining unlicensed wind and solar capacity allocated at distribution level. The table is organised by province, transformer substation, busbar and distribution company or organised industrial zone (OIZ). Some connection points from the table:
| Province | Connection point | Capacity |
|---|---|---|
| Kütahya | 30 Ağustos OIZ | 12 MWe |
| Mersin | Erdemli substation (Toroslar EDAŞ) | 9.6 MWe |
| Istanbul | Şile substation (Anadolu Yakası EDAŞ) | 5 MWe |
| Giresun | Giresun (Aksu) substation (Çoruh EDAŞ) | 4 MWe |
Results reissued on 3 November
TEİAŞ repeated the September results in a second announcement on 3 November. The report, map and table in that announcement are also dated 2 November 2026.
Sources
- TEİAŞ, “Unlicensed Generation Announcement”, 2 November 2026: teias.gov.tr
- TEİAŞ, “Unlicensed Generation Announcement”, 3 November 2026: teias.gov.tr
- Attachments: remaining capacity map, evaluation report for 1-30 September 2026, and distribution-level capacity table (02.11.2026)
Image: TEİAŞ
Rüzgar Enerjisi (Wind Energy)Wind Energy Turkey · Ekim 2026 · Özel EkRead the latest issue free →