{"id":20047,"date":"2026-09-29T02:06:06","date_gmt":"2026-09-28T23:06:06","guid":{"rendered":"https:\/\/ruzgarenerjisi.com.tr\/?p=20047"},"modified":"2026-09-29T02:06:09","modified_gmt":"2026-09-28T23:06:09","slug":"enercon-makes-yield-optimisation-solution-available-for-e-138-ep3-e3","status":"publish","type":"post","link":"https:\/\/ruzgarenerjisi.com.tr\/en\/enercon-makes-yield-optimisation-solution-available-for-e-138-ep3-e3\/","title":{"rendered":"ENERCON makes \u2018Yield+\u2019 optimisation solution available for E-138 EP3 E3"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>New operating parameters from ENERCON\u2019s \u2018Yield+\u2019 programme enable an increase of around 2 percent in the Annual Energy Production of E-138 EP3 E3 turbines, without any hardware modifications.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ENERCON is offering operators of wind farms equipped with E-138 EP3 E3 turbines a new solution to increase their energy yield. Launched at WindEnergy Hamburg, the performance optimisation is now also available for the E-138 EP3 E3 as part of the \u2018Yield+\u2019 programme, under which ENERCON offers yield-enhancement solutions in its solution portfolio for both new and existing turbines.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Around 2 percent more Annual Energy Production<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the specific site conditions, the Yield+ option for the E-138 EP3 E3 can increase Annual Energy Production (AEP) by approximately 2 percent. This figure is based on an average wind speed of 7.0 m\/s at hub height.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The additional energy yield is achieved through site-specific adjustments to the turbine control system. By increasing rotor speed, the nominal power output of the E-138 EP3 E3 can be increased from 4.26 MW to 4.5 MW. No modifications to the wind turbine hardware are required, and the design lifetime of 25 years for the E-138 EP3 E3 remains unchanged.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Grid connection to be assessed before implementation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before implementing the new operating mode, operators should assess, among other factors, whether sufficient capacity is available at the point of common coupling and how the reduced reactive power provision may affect site operation. The ENERCON Sales &amp; After Sales teams provide clarification on these matters and detailed information on the availability of the mode for specific turbine configurations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the company, the option provides EP3 operators with greater flexibility and further reductions in the levelised cost of energy (LCOE). \u201cAs a solutions provider for the renewable energy ecosystem, our aim is to increase the profitability and value of wind energy projects throughout their entire lifecycle,\u201d said <strong>Fatemeh Akhtarirad<\/strong>, Head of Value Offerings at ENERCON Service Product Management. \u201cWe are therefore developing solutions for the continuous optimisation of turbine operation across the entire project lifecycle, enabling our customers to maximise energy yield.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ENERCON plans to gradually extend the \u2018Yield+\u2019 offering to additional turbine types.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New operating parameters from ENERCON\u2019s \u2018Yield+\u2019 programme enable an increase of around 2 percent in the Annual Energy Production of E-138 EP3 E3 turbines, without any hardware modifications.<\/p>\n","protected":false},"author":3,"featured_media":20036,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wpai_generated_summary":"","footnotes":"","_ms_company":[]},"categories":[7398,7338],"tags":[1030,8481],"class_list":["post-20047","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-operations-and-maintenance","category-turbine-technologies","tag-enercon","tag-windenergy-hamburg-2026"],"_links":{"self":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/20047","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/comments?post=20047"}],"version-history":[{"count":1,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/20047\/revisions"}],"predecessor-version":[{"id":20052,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/20047\/revisions\/20052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media\/20036"}],"wp:attachment":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media?parent=20047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/categories?post=20047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/tags?post=20047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}