{"id":20070,"date":"2026-09-29T02:33:02","date_gmt":"2026-09-28T23:33:02","guid":{"rendered":"https:\/\/ruzgarenerjisi.com.tr\/?p=20070"},"modified":"2026-09-29T02:33:05","modified_gmt":"2026-09-28T23:33:05","slug":"mega-windforce-opens-investment-round-to-take-whisperring-wind-turbine-to-production","status":"publish","type":"post","link":"https:\/\/ruzgarenerjisi.com.tr\/en\/mega-windforce-opens-investment-round-to-take-whisperring-wind-turbine-to-production\/","title":{"rendered":"Mega Windforce opens investment round to take WhisperRing wind turbine to production"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Dutch company Mega Windforce has opened a \u20ac1.5 million investment round to take its WhisperRing wind turbine, which uses a patented ring instead of a conventional hub, from a proven concept to a production-ready product. It expects to start production and delivery of the 20 kW WR20kW in 2028.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mega Windforce has opened the \u20ac1.5 million round through the crowdsharing platform Eyevestor. The company\u2019s first commercial product is the WR20kW, a 20-kilowatt wind turbine with a 10-metre rotor built around a patented aerodynamic ring rather than a conventional hub.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mega Windforce has built and extensively tested a working proof of concept and has completed the drivetrain for the WR20kW. The focus now moves to the construction and validation of the commercial prototype, with preparations underway for certification, preproduction, scalable manufacturing and international market launch.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Greece, a distributor with 1.5 GW of installed capacity has signed a Letter of Intent for 3,000 WhisperRing turbines. In the United Kingdom, Mega Windforce is in talks with potential resellers, and the company is working with international partners on its first production facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe next step is more than building a prototype. We have reached a stage where it makes sense to invest in parallel in certification, production, distribution and international market development. By starting that work now, we aim to move more quickly from a validated product to actual production and delivery,\u201d said <strong>Marcel Clerx<\/strong>, CEO of Mega Windforce.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/wr20kw-ring-opengewerkt-0-0-7680-7680-1600x1600-verloop0.01fe8d9e-1024x1024.jpg.webp\" alt=\"Exploded-view render of the WhisperRing ring and generator\" class=\"wp-image-20066\" srcset=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/wr20kw-ring-opengewerkt-0-0-7680-7680-1600x1600-verloop0.01fe8d9e-1024x1024.jpg.webp 1024w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/wr20kw-ring-opengewerkt-0-0-7680-7680-1600x1600-verloop0.01fe8d9e-300x300.jpg.webp 300w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/wr20kw-ring-opengewerkt-0-0-7680-7680-1600x1600-verloop0.01fe8d9e-150x150.jpg.webp 150w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/wr20kw-ring-opengewerkt-0-0-7680-7680-1600x1600-verloop0.01fe8d9e-768x768.jpg.webp 768w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/wr20kw-ring-opengewerkt-0-0-7680-7680-1600x1600-verloop0.01fe8d9e-1536x1536.jpg.webp 1536w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/wr20kw-ring-opengewerkt-0-0-7680-7680-1600x1600-verloop0.01fe8d9e-860x860.jpg.webp 860w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/wr20kw-ring-opengewerkt-0-0-7680-7680-1600x1600-verloop0.01fe8d9e.jpg.webp 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">The WhisperRing ring and generator (render). \u00a9 Mega Windforce<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Targeting lower costs for locally generated wind energy<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">WhisperRing addresses segments of the wind market where energy from conventional turbines remains too expensive. The WR20kW is aimed at locations with a strong need for local energy generation, including business parks, energy hubs, microgrids and energy communities such as agricultural cooperatives.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">WhisperRing replaces the hub and nacelle of a conventional turbine with a patented ring that carries the blades. According to the company, the ring delivers a higher yield from the same wind, while an automated production process for lightweight composite components keeps manufacturing costs low. For the WR20kW, Mega Windforce is targeting an energy cost 30 to 50 percent below that of comparable wind turbines.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Details of the investment round<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The new funding will finance the construction and validation of the commercial WR20kW prototype, the subsequent preproduction series, certification, further optimisation and preparations for scalable manufacturing. The round is open on Eyevestor at a pre-money valuation of \u20ac15 million. The current management team has invested \u20ac3 million, part of which is committed as co-investment in this round. Private investors can participate from \u20ac500 and will receive certificates representing an economic interest in Mega Windforce.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"900\" src=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/WR20_proto_001-900-72.f3a6e79f.jpg.webp\" alt=\"The WhisperRing WR20kW prototype under construction in the workshop\" class=\"wp-image-20065\" srcset=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/WR20_proto_001-900-72.f3a6e79f.jpg.webp 600w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/09\/WR20_proto_001-900-72.f3a6e79f-200x300.jpg.webp 200w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">The WR20kW prototype in the workshop. \u00a9 Mega Windforce<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe want investors not only to participate financially in the company, but also to follow its development closely. The coming period will show how technology, production and the market come together,\u201d said Marcel Clerx.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mega Windforce expects to start production and delivery of the WR20kW in 2028. The company\u2019s longer-term ambition is to scale the WhisperRing technology to turbines with higher power ratings.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dutch company Mega Windforce has opened a \u20ac1.5 million investment round to take its WhisperRing wind turbine, which uses a patented ring instead of a conventional hub, from a proven concept to a production-ready product. It expects to start production and delivery of the 20 kW WR20kW in 2028.<\/p>\n","protected":false},"author":3,"featured_media":20064,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"wpai_generated_summary":"","footnotes":"","_ms_company":[]},"categories":[7338],"tags":[8513,8514],"class_list":["post-20070","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-turbine-technologies","tag-mega-windforce","tag-whisperring"],"_links":{"self":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/20070","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/comments?post=20070"}],"version-history":[{"count":1,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/20070\/revisions"}],"predecessor-version":[{"id":20081,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/20070\/revisions\/20081"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media\/20064"}],"wp:attachment":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media?parent=20070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/categories?post=20070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/tags?post=20070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}