{"id":20164,"date":"2026-10-02T19:25:34","date_gmt":"2026-10-02T16:25:34","guid":{"rendered":"https:\/\/ruzgarenerjisi.com.tr\/enda-enerji-holding-invests-usd-10-million-in-urla-wind-farm-expansion\/"},"modified":"2026-10-02T19:25:34","modified_gmt":"2026-10-02T16:25:34","slug":"enda-enerji-holding-invests-usd-10-million-in-urla-wind-farm-expansion","status":"publish","type":"post","link":"https:\/\/ruzgarenerjisi.com.tr\/en\/enda-enerji-holding-invests-usd-10-million-in-urla-wind-farm-expansion\/","title":{"rendered":"Enda Enerji Holding invests USD 10 million in Urla wind farm expansion"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Two additional turbines will increase electrical installed capacity from 13 MWe to 21.4 MWe. The company is targeting commissioning in December.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Enda Enerji Holding has held a groundbreaking ceremony for a USD 10 million expansion of its Urla wind farm in \u0130zmir, T\u00fcrkiye. According to the company, the project will add two wind turbines to the existing plant.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-1024x683.jpg.webp\" alt=\"Members of Enda Enerji Holding\u2019s board at the groundbreaking ceremony for the Urla wind farm expansion.\" class=\"wp-image-20162\" srcset=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-1024x683.jpg.webp 1024w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-300x200.jpg.webp 300w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-768x512.jpg.webp 768w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-1536x1024.jpg.webp 1536w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-330x220.jpg.webp 330w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-420x280.jpg.webp 420w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-615x410.jpg.webp 615w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz-860x573.jpg.webp 860w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/10\/9QflAdKIbz.jpg.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Members of Enda Enerji Holding\u2019s board at the groundbreaking ceremony for the Urla wind farm expansion.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Electrical capacity to rise by about 65 percent<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The expansion will increase the number of turbines from five to seven. Electrical installed capacity will rise from 13 MWe to 21.4 MWe, while mechanical installed capacity will increase from 15 MWm to 23.4 MWm. The increase in electrical capacity is approximately 65 percent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company expects the work to take around two months and is targeting December for commissioning of the additional capacity.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Expansion at an existing site<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Speaking at the ceremony, which was attended by members of the company\u2019s board, Enda Enerji Holding Chair Serdar Da\u011f\u0131stan said the group was continuing to develop its generation capacity in T\u00fcrkiye while evaluating investment opportunities abroad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Da\u011f\u0131stan said permitting for new European investments was continuing alongside investments to increase domestic generation capacity. The company aims to expand its installed capacity through new partnerships in T\u00fcrkiye and abroad, while diversifying its generation sources and geographical presence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In earlier coverage, R\u00fczgar Enerjisi <a href=\"https:\/\/ruzgarenerjisi.com.tr\/enda-enerji-urla-reste-kapasite-artisi-icin-orman-izin-surecini-tamamladi\/\">reported on 25 August 2026<\/a> that the forest-permit process and site handover for the capacity increase had been completed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Source:<\/strong> Momentum \u0130leti\u015fim \/ Enda Enerji press release supplied on 2 October 2026. The August permit report is historical background; the project figures and December commissioning target come from the new release.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two additional turbines will increase electrical installed capacity from 13 MWe to 21.4 MWe. The company is targeting commissioning in December.<\/p>\n","protected":false},"author":3,"featured_media":20162,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"wpai_generated_summary":"","footnotes":"","_ms_company":[]},"categories":[7325],"tags":[],"class_list":["post-20164","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-wind-energy-sector-news"],"_links":{"self":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/20164","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/comments?post=20164"}],"version-history":[{"count":0,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/20164\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media\/20162"}],"wp:attachment":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media?parent=20164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/categories?post=20164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/tags?post=20164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}