{"id":21156,"date":"2026-11-13T14:26:39","date_gmt":"2026-11-13T11:26:39","guid":{"rendered":"https:\/\/ruzgarenerjisi.com.tr\/cop31-efor-holding-signs-eur-90-million-loan-agreement-with-kfw-ipex-bank-for-160-mw-yellice-wind-farm\/"},"modified":"2026-11-13T15:08:59","modified_gmt":"2026-11-13T12:08:59","slug":"cop31-efor-holding-signs-eur-90-million-loan-agreement-with-kfw-ipex-bank-for-160-mw-yellice-wind-farm","status":"publish","type":"post","link":"https:\/\/ruzgarenerjisi.com.tr\/en\/cop31-efor-holding-signs-eur-90-million-loan-agreement-with-kfw-ipex-bank-for-160-mw-yellice-wind-farm\/","title":{"rendered":"COP31: Efor Holding signs EUR 90 million loan agreement with KfW IPEX-Bank for 160 MW Yellice wind farm"},"content":{"rendered":"<p><strong>Efor Holding has signed a EUR 90 million long-term loan agreement with Germany&#8217;s KfW IPEX-Bank for the 160 MW YEKA 4 Yellice Wind Power Plant (WPP), developed by its group company EFR Enerji Yat\u0131r\u0131m in Sivas, T\u00fcrkiye. According to the holding&#8217;s LinkedIn post dated 13 November 2026, the agreement was signed in the framework of the UN Climate Change Conference COP31 in Antalya.<\/strong><\/p>\n<h2>Commissioning planned for November<\/h2>\n<p>According to the company, Yellice WPP is planned to be commissioned in November. Efor Holding said the plant is expected to avoid approximately 285,000 tonnes of CO\u2082-equivalent greenhouse gas emissions per year once operational, adding that the project aims to contribute to T\u00fcrkiye&#8217;s renewable energy capacity and low-carbon power generation.<\/p>\n<p>No details on the tenor or other terms of the loan were disclosed.<\/p>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-kredi-sozlesmesi.webp\" alt=\"Efor Holding and KfW IPEX-Bank representatives presenting the signed Yellice wind farm loan agreement\" class=\"wp-image-21158\" width=\"1400\" height=\"1017\" srcset=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-kredi-sozlesmesi.webp 1400w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-kredi-sozlesmesi-300x218.webp 300w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-kredi-sozlesmesi-1024x744.webp 1024w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-kredi-sozlesmesi-768x558.webp 768w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption>The Yellice WPP loan agreement was signed at COP31. Image: Efor Holding<\/figcaption><\/figure>\n<h2>Target of 3,000 MW by 2030<\/h2>\n<p>Efor Holding said it continues to invest towards its goal of expanding its total energy portfolio to 3,000 MW by 2030, and thanked the KfW IPEX-Bank team for the cooperation.<\/p>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-toplu-fotograf.webp\" alt=\"Efor Holding and KfW IPEX-Bank delegations at the Yellice WPP loan agreement signing ceremony at COP31\" class=\"wp-image-21157\" width=\"1400\" height=\"924\" srcset=\"https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-toplu-fotograf.webp 1400w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-toplu-fotograf-300x198.webp 300w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-toplu-fotograf-1024x676.webp 1024w, https:\/\/ruzgarenerjisi.com.tr\/wp-content\/uploads\/2026\/11\/efor-yellice-kfw-toplu-fotograf-768x507.webp 768w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><figcaption>Efor Holding and KfW IPEX-Bank delegations at the signing ceremony. Image: Efor Holding<\/figcaption><\/figure>\n<p>During COP31, KfW IPEX-Bank also signed <a href=\"https:\/\/ruzgarenerjisi.com.tr\/en\/cop31-kfw-ipex-bank-and-ziraat-bankasi-sign-mou-for-up-to-eur-500-million-in-financing-for-wind-projects\/\">a memorandum of understanding with Ziraat Bankas\u0131 for up to EUR 500 million in financing cooperation<\/a> targeting wind projects in T\u00fcrkiye. COP31 runs in Antalya until 20 November.<\/p>\n<h3>Sources<\/h3>\n<ul>\n<li>Efor Holding, LinkedIn post (&#8220;Efor Holding Signs Financing Agreement with KfW IPEX-Bank for 160 MW Wind Project at COP31&#8221;), 13.11.2026, <a href=\"https:\/\/www.linkedin.com\/company\/efor-holding\/posts\/\" target=\"_blank\" rel=\"noopener\">https:\/\/www.linkedin.com\/company\/efor-holding\/posts\/<\/a><\/li>\n<\/ul>\n<p><em>Images: Efor Holding<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Efor Holding&#8217;s group company EFR Enerji Yat\u0131r\u0131m has signed a EUR 90 million long-term loan agreement with KfW IPEX-Bank at COP31 for the 160 MW YEKA 4 Yellice wind power plant in Sivas, T\u00fcrkiye.<\/p>\n","protected":false},"author":3,"featured_media":21159,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wpai_generated_summary":"","footnotes":"","_ms_company":[]},"categories":[7386,7325],"tags":[],"class_list":["post-21156","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investors-developers","category-wind-energy-sector-news"],"_links":{"self":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/21156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/comments?post=21156"}],"version-history":[{"count":1,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/21156\/revisions"}],"predecessor-version":[{"id":21161,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/21156\/revisions\/21161"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media\/21159"}],"wp:attachment":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media?parent=21156"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/categories?post=21156"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/tags?post=21156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}