{"id":3977,"date":"2025-02-24T10:05:56","date_gmt":"2025-02-24T07:05:56","guid":{"rendered":"https:\/\/www.ruzgarenerjisi.com.tr\/en\/?p=3977"},"modified":"2026-09-14T22:09:54","modified_gmt":"2026-09-14T19:09:54","slug":"enercon-shaping-turkiyes-energy-transition","status":"publish","type":"post","link":"https:\/\/ruzgarenerjisi.com.tr\/en\/enercon-shaping-turkiyes-energy-transition\/","title":{"rendered":"ENERCON: Shaping Tu\u0308rkiye\u2019s Energy Transition"},"content":{"rendered":"<p class=\"p1\">Since its establishment in 1984, ENERCON has pioneered in wind energy technology by developing onshore wind turbines and playing a key role in the industry. With over 33,000 installed wind turbines worldwide and a cumulative installed capacity exceeding 64 GW, the company stands as one of the architects of a sustainable future. It has established itself as one of the leading brands in the global wind energy sector by means of its innovative wind turbine technology, high-quality standards, and decades of experience. In T\u00fcrkiye, it is recognized as one of the pioneers of the country\u2019s energy transition. As T\u00fcrkiye\u2019s first wind turbine brand, <a href=\"https:\/\/www.ruzgarenerjisi.com.tr\/turkiyede-kurulu-enercon-turbinleri-3-gwa-ulasti\/\" target=\"_blank\" rel=\"noopener\">ENERCON T\u00fcrkiye<\/a> has achieved many industry milestones throughout its 27-year history. Today, with more than 1,250wind turbines installed, the company alone accounts for nearly 24% of T\u00fcrkiye\u2019s total 13 GW installed wind capacity.<\/p>\n<p class=\"p1\">The company entered the Turkish market in 1997 and has since exceeded a cumulative installed capacity of 3 GW, starting from just 1.5 MW, marking a significant milestone in its journey. By the end of 2025, it aims to achieve a total installed capacity of 4 GW. As the turbine supplier for the 1,000 MW mega project encompassing the entire YEKA RES-2 tenders, the company continues to play a key role in T\u00fcrkiye\u2019s energy transition through its contracts in YEKA-2 and YEKA-3.<\/p>\n<p class=\"p1\">The company is solidifying its role in T\u00fcrkiye\u2019s wind energy sector with ongoing and contracted projects. Rather than seeing T\u00fcrkiye merely as a sales market, it actively engages in production and engineering activities. Through its investments in education and R&amp;D, ENERCON contributes to developing innovative wind energy technologies in the country. As part of its collaboration with <a href=\"https:\/\/www.ruzgarenerjisi.com.tr\/enercon-ve-enerjisa-uretim-yeka-2nin-ikinci-asamasi-icin-imzalari-bilbaoda-atti\/\" target=\"_blank\" rel=\"noopener\">Enerjisa \u00dcretim<\/a>, <a href=\"https:\/\/www.ruzgarenerjisi.com.tr\/turkiyede-kurulu-enercon-turbinleri-3-gwa-ulasti\/\" target=\"_blank\" rel=\"noopener\">ENERCON<\/a> is set to test the E-175 EP5 model\u2014one of the world\u2019s largest wind turbines with a rotor diameter of 175 meters\u2014for the first time in T\u00fcrkiye at the Band\u0131rma Energy Hub. The E-175 EP5 E2 7 MW stands out as one of ENERCON\u2019s latest and most advanced turbine designs in engineering. <a href=\"https:\/\/www.enercon.de\/en\" target=\"_blank\" rel=\"noopener\">ENERCON<\/a>\u2019s signature direct drive technology distinguishes the company from other brands and is also a key feature in this model. Additionally, incorporating a permanent magnet system maximizes energy efficiency, demonstrating its commitment to high performance. With its robust performance and optimized aerodynamic design, the E-175 EP5 E2 ensures maximum energy generation even at low and medium wind speeds, reflecting ENERCON\u2019s sustainability and technology-driven vision.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since its establishment in 1984, ENERCON has pioneered in wind energy technology by developing onshore wind turbines and playing a key role in the industry. With\u2026<\/p>\n","protected":false},"author":5,"featured_media":19490,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"wpai_generated_summary":"","footnotes":"","_ms_company":[]},"categories":[7338],"tags":[1030,60,646,1933,8464],"class_list":["post-3977","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-turbine-technologies","tag-enercon","tag-featured","tag-onshore-wind-turbines","tag-yeka-res-2","tag-yeka-3"],"_links":{"self":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/3977","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/comments?post=3977"}],"version-history":[{"count":1,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/3977\/revisions"}],"predecessor-version":[{"id":18554,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/posts\/3977\/revisions\/18554"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media\/19490"}],"wp:attachment":[{"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/media?parent=3977"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/categories?post=3977"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ruzgarenerjisi.com.tr\/en\/wp-json\/wp\/v2\/tags?post=3977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}